�?Having said that, if the tension stabilization time is six min, the fitting diploma is the bottom along with the analysis result of the drilling fluid lost control efficiency is “common.�?In a specific vary, the coincidence diploma on the indoor and area drilling fluid lost control performance is negatively correlated Using the stress